Winter Maintenance Is A Key Method Of Jiemi Four Floor Maintenance – Solid Wood Flooring, Bamboo

Winter Floor Most in need of maintenance season. Here on the floor to introduce the maintenance of several ways. Solid wood flooring Maintenance Points (1) the floor should be laid in the late construction, construction may not cross. As soon as possible after laying sanding and painting. So as not to stain the floor or to damp deformation. (2) laying the floor before laying the scene should unpacking stacked in 1 to 2 days to adapt to the environment, so that expansion and contraction deformation after laying. (3) laying damp proof measures should be prepared, especially in the more humid places the bottom. Measures moisture proof coating paint shop moisture film, using foreshadowing treasure...

more info
Website Apps